Line 33: Line 33:  
* create vertical plate storage on a rack shelf
 
* create vertical plate storage on a rack shelf
 
* create chained vertical storage area for material lengths (possibly using the short rack as a basis)
 
* create chained vertical storage area for material lengths (possibly using the short rack as a basis)
 +
* go through the machine tools and machine tool accessories to determine which we can use and which are surplus
 +
* install the single metal door in the opening to the Grinding Room
 +
* determine whether the large drill press can be returned to safe operation fully guarded, without tools needed to change the drill speed
 +
 +
== future [[Metal Shop]], pending materials ==
 +
* remove the wooden cabinetry and replace it with metal shelving
 +
* install double metal doors to the Welding Room and close up the remaining gap
 +
* once both Grinding and Welding have doors, mount the air filter in the grinding room (please see Andrew N on this)