Kwartzlab is always in a state of flux, with new tools, areas, projects, initiatives, facilities, processes, and so on and so forth. As a fully volunteer-run organization, all members are expected to help out. If you're keen on making the lab a better place, consider helping out with one of the projects below. | Kwartzlab is always in a state of flux, with new tools, areas, projects, initiatives, facilities, processes, and so on and so forth. As a fully volunteer-run organization, all members are expected to help out. If you're keen on making the lab a better place, consider helping out with one of the projects below. | ||
+ | |||
+ | If you are adding a task that does not have an obvious owner, please indicate the owner/contact point of the task. If you are looking to complete a task, please connect with the area leader or contact person indicated. | ||
= Ongoing Projects = | = Ongoing Projects = | ||
+ | |||
+ | * empty various garbage/scrap bins/chip pails/dust bags located throughout the lab including wood shop, metal shop, and laser areas | ||
== Expansion build-out == | == Expansion build-out == | ||
− | * see | + | * see {{slack|discuss-expansion}} |
* assisting with the expansion build-out in whatever areas are needed during the project | * assisting with the expansion build-out in whatever areas are needed during the project | ||
== [[Drink Fridge]] and [[Snack Cabinet]] == | == [[Drink Fridge]] and [[Snack Cabinet]] == | ||
− | * see | + | * see {{slack|drinks-and-snacks}}, post if you'd like to assist |
* purchasing stock and/or restocking the drink fridge and/or snack cabinet | * purchasing stock and/or restocking the drink fridge and/or snack cabinet | ||
+ | ** Wholesale Club, Costco, and A1 Cash & Carry are the usual restocking points to date | ||
+ | * building organizers for the [[Snack Cabinet]] or replacing the cabinet with other shallower cabinet or shelving | ||
+ | |||
+ | == [[Smelly Booth]] == | ||
+ | The [[Smelly Booth]] has a location and roughed-in ventilation, but does not have a champion yet. If you would like to be able to do large epoxy pours, have a resin printer, or work with chemical processes that require ventilation, consider putting in some effort to make this a reality. See {{slack|project-fume-booth}}. | ||
− | == | + | == Vending Machine == |
− | The | + | The Vending Machine needs to be returned to functionality, so that it can start dispensing not only snacks but maker materials (Arduinos, Raspberry Pis, etc). There is also a proposal to develop an internal KwartzCoin digital currency that the vending machine could tap into via a member's [[Key Fob]]. |
= One-Time Projects = | = One-Time Projects = | ||
− | * | + | * washing machine: |
− | * | + | ** troubleshooting why it won't spin |
+ | ** determining a permanent location for it with decidated pluming and drain | ||
* find more accessible home for [[Loanable Tools]] | * find more accessible home for [[Loanable Tools]] | ||
− | * re-mount bike storage hooks for bike parking (see # | + | * re-mount bike storage hooks for bike parking (see {{slack|bikes}}) |
+ | * listing donated items on eBay (see Andrew N) | ||
+ | |||
+ | == [[Metal Shop]] == | ||
+ | * purge ducting from metal shop (after sending notice in #general that such a purge will happen) | ||
+ | * swap low rack at entrance for disassembled tall rack | ||
+ | * move lights: long light over grey worktable, short light centered over rack aisle | ||
+ | * put all hammers on peg board on rack | ||
+ | * determine what other tools would make more sense to go on a peg board | ||
+ | * move power drop over grey table | ||
+ | * create vertical plate storage on a rack shelf | ||
+ | * create chained vertical storage area for material lengths (possibly using the short rack as a basis) | ||
+ | * go through the machine tools and machine tool accessories to determine which we can use and which are surplus | ||
+ | * organize machine tools and accessories into one of the three steel fastener storage racks | ||
+ | * install the single metal door in the opening to the Grinding Room | ||
+ | * remove the printing on the chip scrap pails and label 2 for steel chips only and 2 for aluminum chips only | ||
+ | |||
+ | == future [[Metal Shop]], pending materials == | ||
+ | * remove the wooden cabinetry and replace it with metal shelving | ||
+ | * install double metal doors to the Welding Room and close up the remaining gap | ||
+ | * once both Grinding and Welding have doors, mount the air filter in the grinding room (see Andrew N) | ||
+ | |||
+ | == [[Electronics]] == | ||
+ | * modify two of the work tables to remove the back brace in favour of a middle brace (to permit seating from both sides, see Jim R) | ||
+ | * determine where the third work table will be going and move it | ||
+ | * get all wire spools stored up in the rafters on rods/tubes | ||
+ | * build guide tubes for wire to go from spools, down the wall, to a reachable height |
Latest revision as of 03:56, 12 March 2024
Kwartzlab is always in a state of flux, with new tools, areas, projects, initiatives, facilities, processes, and so on and so forth. As a fully volunteer-run organization, all members are expected to help out. If you're keen on making the lab a better place, consider helping out with one of the projects below.
If you are adding a task that does not have an obvious owner, please indicate the owner/contact point of the task. If you are looking to complete a task, please connect with the area leader or contact person indicated.
Ongoing Projects
- empty various garbage/scrap bins/chip pails/dust bags located throughout the lab including wood shop, metal shop, and laser areas
Expansion build-out
- see #discuss-expansion
- assisting with the expansion build-out in whatever areas are needed during the project
Drink Fridge and Snack Cabinet
- see #drinks-and-snacks, post if you'd like to assist
- purchasing stock and/or restocking the drink fridge and/or snack cabinet
- Wholesale Club, Costco, and A1 Cash & Carry are the usual restocking points to date
- building organizers for the Snack Cabinet or replacing the cabinet with other shallower cabinet or shelving
Smelly Booth
The Smelly Booth has a location and roughed-in ventilation, but does not have a champion yet. If you would like to be able to do large epoxy pours, have a resin printer, or work with chemical processes that require ventilation, consider putting in some effort to make this a reality. See #project-fume-booth.
Vending Machine
The Vending Machine needs to be returned to functionality, so that it can start dispensing not only snacks but maker materials (Arduinos, Raspberry Pis, etc). There is also a proposal to develop an internal KwartzCoin digital currency that the vending machine could tap into via a member's Key Fob.
One-Time Projects
- washing machine:
- troubleshooting why it won't spin
- determining a permanent location for it with decidated pluming and drain
- find more accessible home for Loanable Tools
- re-mount bike storage hooks for bike parking (see #bikes)
- listing donated items on eBay (see Andrew N)
Metal Shop
- purge ducting from metal shop (after sending notice in #general that such a purge will happen)
- swap low rack at entrance for disassembled tall rack
- move lights: long light over grey worktable, short light centered over rack aisle
- put all hammers on peg board on rack
- determine what other tools would make more sense to go on a peg board
- move power drop over grey table
- create vertical plate storage on a rack shelf
- create chained vertical storage area for material lengths (possibly using the short rack as a basis)
- go through the machine tools and machine tool accessories to determine which we can use and which are surplus
- organize machine tools and accessories into one of the three steel fastener storage racks
- install the single metal door in the opening to the Grinding Room
- remove the printing on the chip scrap pails and label 2 for steel chips only and 2 for aluminum chips only
future Metal Shop, pending materials
- remove the wooden cabinetry and replace it with metal shelving
- install double metal doors to the Welding Room and close up the remaining gap
- once both Grinding and Welding have doors, mount the air filter in the grinding room (see Andrew N)
Electronics
- modify two of the work tables to remove the back brace in favour of a middle brace (to permit seating from both sides, see Jim R)
- determine where the third work table will be going and move it
- get all wire spools stored up in the rafters on rods/tubes
- build guide tubes for wire to go from spools, down the wall, to a reachable height