Line 5: |
Line 5: |
| = Ongoing Projects = | | = Ongoing Projects = |
| | | |
− | * empty various garbage/scrap bins located throughout the lab and in the wood shop and laser areas | + | * empty various garbage/scrap bins/chip pails/dust bags located throughout the lab including wood shop, metal shop, and laser areas |
| | | |
| == Expansion build-out == | | == Expansion build-out == |
Line 15: |
Line 15: |
| * purchasing stock and/or restocking the drink fridge and/or snack cabinet | | * purchasing stock and/or restocking the drink fridge and/or snack cabinet |
| ** Wholesale Club, Costco, and A1 Cash & Carry are the usual restocking points to date | | ** Wholesale Club, Costco, and A1 Cash & Carry are the usual restocking points to date |
| + | * building organizers for the [[Snack Cabinet]] or replacing the cabinet with other shallower cabinet or shelving |
| | | |
| == [[Smelly Booth]] == | | == [[Smelly Booth]] == |
Line 24: |
Line 25: |
| = One-Time Projects = | | = One-Time Projects = |
| | | |
− | * troubleshooting the washing machine, and determining a permanent location for it with decidated pluming and drain | + | * washing machine: |
− | * building organizers for the [[Snack Cabinet]] or replacing the cabinet with other shallower cabinet or shelving
| + | ** troubleshooting why it won't spin |
| + | ** determining a permanent location for it with decidated pluming and drain |
| * find more accessible home for [[Loanable Tools]] | | * find more accessible home for [[Loanable Tools]] |
| * re-mount bike storage hooks for bike parking (see #bikes on [[Slack]]) | | * re-mount bike storage hooks for bike parking (see #bikes on [[Slack]]) |
Line 34: |
Line 36: |
| * swap low rack at entrance for disassembled tall rack | | * swap low rack at entrance for disassembled tall rack |
| * move lights: long light over grey worktable, short light centered over rack aisle | | * move lights: long light over grey worktable, short light centered over rack aisle |
− | * put hammers on peg board on rack | + | * put all hammers on peg board on rack |
| * determine what other tools would make more sense to go on a peg board | | * determine what other tools would make more sense to go on a peg board |
| * move power drop over grey table | | * move power drop over grey table |
Line 40: |
Line 42: |
| * create chained vertical storage area for material lengths (possibly using the short rack as a basis) | | * create chained vertical storage area for material lengths (possibly using the short rack as a basis) |
| * go through the machine tools and machine tool accessories to determine which we can use and which are surplus | | * go through the machine tools and machine tool accessories to determine which we can use and which are surplus |
| + | * organize machine tools and accessories into one of the three steel fastener storage racks |
| * install the single metal door in the opening to the Grinding Room | | * install the single metal door in the opening to the Grinding Room |
− | * determine whether the large drill press can be returned to safe operation fully guarded, without tools needed to change the drill speed | + | * remove the printing on the chip scrap pails and label 2 for steel chips only and 2 for aluminum chips only |
− | * take metal chip scrap to scrap dealer or garbage bin (chip scrap free to take for anyone willing to remove it from the lab)
| |
− | * change out the chip scrap bins with the pails with lids for easier chip scrap removal
| |
| | | |
| == future [[Metal Shop]], pending materials == | | == future [[Metal Shop]], pending materials == |
Line 49: |
Line 50: |
| * install double metal doors to the Welding Room and close up the remaining gap | | * install double metal doors to the Welding Room and close up the remaining gap |
| * once both Grinding and Welding have doors, mount the air filter in the grinding room (see Andrew N) | | * once both Grinding and Welding have doors, mount the air filter in the grinding room (see Andrew N) |
| + | |
| + | == [[Electronics]] == |
| + | * modify two of the work tables to remove the back brace in favour of a middle brace (to permit seating from both sides, see Jim R) |
| + | * determine where the third work table will be going and move it |
| + | * get all wire spools stored up in the rafters on rods/tubes |
| + | * build guide tubes for wire to go from spools, down the wall, to a reachable height |