Changes

Jump to navigation Jump to search
268 bytes added ,  02:45, 21 November 2023
no edit summary
Line 5: Line 5:  
= Ongoing Projects =
 
= Ongoing Projects =
   −
* empty various garbage/scrap bins located throughout the lab and in the wood shop and laser areas
+
* empty various garbage/scrap bins/chip pails/dust bags located throughout the lab including wood shop, metal shop, and laser areas
    
== Expansion build-out ==
 
== Expansion build-out ==
Line 15: Line 15:  
* purchasing stock and/or restocking the drink fridge and/or snack cabinet
 
* purchasing stock and/or restocking the drink fridge and/or snack cabinet
 
** Wholesale Club, Costco, and A1 Cash & Carry are the usual restocking points to date
 
** Wholesale Club, Costco, and A1 Cash & Carry are the usual restocking points to date
 +
* building organizers for the [[Snack Cabinet]] or replacing the cabinet with other shallower cabinet or shelving
    
== [[Smelly Booth]] ==
 
== [[Smelly Booth]] ==
Line 24: Line 25:  
= One-Time Projects =
 
= One-Time Projects =
   −
* troubleshooting the washing machine, and determining a permanent location for it with decidated pluming and drain
+
* washing machine:
* building organizers for the [[Snack Cabinet]] or replacing the cabinet with other shallower cabinet or shelving
+
** troubleshooting why it won't spin
 +
** determining a permanent location for it with decidated pluming and drain
 
* find more accessible home for [[Loanable Tools]]
 
* find more accessible home for [[Loanable Tools]]
 
* re-mount bike storage hooks for bike parking (see #bikes on [[Slack]])
 
* re-mount bike storage hooks for bike parking (see #bikes on [[Slack]])
Line 34: Line 36:  
* swap low rack at entrance for disassembled tall rack
 
* swap low rack at entrance for disassembled tall rack
 
* move lights: long light over grey worktable, short light centered over rack aisle
 
* move lights: long light over grey worktable, short light centered over rack aisle
* put hammers on peg board on rack
+
* put all hammers on peg board on rack
 
* determine what other tools would make more sense to go on a peg board
 
* determine what other tools would make more sense to go on a peg board
 
* move power drop over grey table
 
* move power drop over grey table
Line 40: Line 42:  
* create chained vertical storage area for material lengths (possibly using the short rack as a basis)
 
* create chained vertical storage area for material lengths (possibly using the short rack as a basis)
 
* go through the machine tools and machine tool accessories to determine which we can use and which are surplus
 
* go through the machine tools and machine tool accessories to determine which we can use and which are surplus
 +
* organize machine tools and accessories into one of the three steel fastener storage racks
 
* install the single metal door in the opening to the Grinding Room
 
* install the single metal door in the opening to the Grinding Room
* determine whether the large drill press can be returned to safe operation fully guarded, without tools needed to change the drill speed
+
* remove the printing on the chip scrap pails and label 2 for steel chips only and 2 for aluminum chips only
* take metal chip scrap to scrap dealer or garbage bin (chip scrap free to take for anyone willing to remove it from the lab)
  −
* change out the chip scrap bins with the pails with lids for easier chip scrap removal
      
== future [[Metal Shop]], pending materials ==
 
== future [[Metal Shop]], pending materials ==
Line 49: Line 50:  
* install double metal doors to the Welding Room and close up the remaining gap
 
* install double metal doors to the Welding Room and close up the remaining gap
 
* once both Grinding and Welding have doors, mount the air filter in the grinding room (see Andrew N)
 
* once both Grinding and Welding have doors, mount the air filter in the grinding room (see Andrew N)
 +
 +
== [[Electronics]] ==
 +
* modify two of the work tables to remove the back brace in favour of a middle brace (to permit seating from both sides, see Jim R)
 +
* determine where the third work table will be going and move it
 +
* get all wire spools stored up in the rafters on rods/tubes
 +
* build guide tubes for wire to go from spools, down the wall, to a reachable height

Navigation menu