* create vertical plate storage on a rack shelf
* create vertical plate storage on a rack shelf
* create chained vertical storage area for material lengths (possibly using the short rack as a basis)
* create chained vertical storage area for material lengths (possibly using the short rack as a basis)
+
* go through the machine tools and machine tool accessories to determine which we can use and which are surplus
+
* install the single metal door in the opening to the Grinding Room
+
* determine whether the large drill press can be returned to safe operation fully guarded, without tools needed to change the drill speed
+
+
== future [[Metal Shop]], pending materials ==
+
* remove the wooden cabinetry and replace it with metal shelving
+
* install double metal doors to the Welding Room and close up the remaining gap
+